Hello all!
This week i have made amazing progress on this Greensboro Coliseum i have been dying to show everyone! This project is going to be very lengthy so bear with me here.
- Center Pod and Stage Lights are from the Baltimore 2020 map that was uploaded by @AaronLurie
- The megatron, and stands were handmade from scratch with a total of 7 hours combined.
Jan 20th, 2022 - Added Tarp, Fixed speakers, Adjusted Coliseum Corners, Added dome and terrain floor, Entrance / Exit Tunnel Added.